Hey guys. Would really appreciate a ballpark on this (just so I know I'm not getting ripped off when I get quotes).
I'm building a 18'x20' pavilion in the back yard and need a slab poured (19'x21' slab). 4" slab with 12" monolithic pour. I'll be sitting 6x6 beams (3 on each side) on there, so I probably need a pier poured for all 6 beams. Any idea how much this should set me back? I'll need them to form it, grade it (minimal grading needed), and I'll want a smooth finish.
Thanks for the help!
I'm building a 18'x20' pavilion in the back yard and need a slab poured (19'x21' slab). 4" slab with 12" monolithic pour. I'll be sitting 6x6 beams (3 on each side) on there, so I probably need a pier poured for all 6 beams. Any idea how much this should set me back? I'll need them to form it, grade it (minimal grading needed), and I'll want a smooth finish.
Thanks for the help!